117.6km 33kV line and customer substation

Client
Zimbabwe Power Company (ZPC)
Country
Zimbabwe
Period
Contract

Overhead line construction at scale, terminating in a substation built at the customer point and its HT cabling.

What we did

  • Construction of 117.6km of 33kV line
  • Construction of substation at customer point
  • HT cabling and termination

On site

Two linesmen working from a suspended cradle on a mast
Two linesmen working from a suspended cradle on a mast
Newly installed poles running along a grass verge beside a road
Newly installed poles running along a grass verge beside a road

Work of this kind for your plant

We represent SEW Eurodrive, Optibelt, Schneider Electric, Optimised Power Products across the region, and carry the same scope from design through to commissioning and follow-up maintenance.

Talk to an engineer

HPC Africa SA Pty Ltd pictorial business profile 2024, section 6; and the HPC Africa Zimbabwe pictorial profile. Supplied by HA GROUP.